Fieldstone Crossing Phase 2
Sector: Water Supply and Storage • Location: Oregon, United States of America
Source: Dodge
The Fieldstone Crossing Subdivision Phase 2 is an approximately 11 lot subdivision located on 9th St in Hermiston, Oregon. The project includes 514 feet of new asphalt road with curb and gutter, sidewalk, stormwater, sewer and water utilities. The project also includes 694 feet of asphalt road widening with curb and gutter, sidewalk, stormwater, sewer and water utilities on W. Gettman Rd.
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Road, Waste Processing and Treatment, Government
- Location
- Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fieldstone Crossing Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Fieldstone Crossing Subdivision Phase 2 is an approximately 11 lot subdivision located on 9th St in Hermiston, Oregon. The project includes 514 feet of new asphalt road with curb and gutter, sidewalk, stormwater, sewer and water utilities. The project also includes 694 feet of asphalt road widening with curb and gutter, sidewalk, stormwater, sewer and water utilities on W. Gettman Rd. |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Road, Waste Processing and Treatment, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
