Fifth NRE Jazz Club / De Bever Architecten
Sector: Stadium
Source: ArchDaily
This was achieved by integrating modern sustainable elements with the existing building in an invisible manner, thus, keeping the exterior and interior surfaces in their existing character. New windows are added seamlessly to the interior allowing the exterior façade to remain unbroken. The only two visible interventions from the exterior are constructed with steel and glass and are used to create
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This was achieved by integrating modern sustainable elements with the existing building in an invisible manner, thus, keeping the exterior and interior surfaces in their existing character. New windows are added seamlessly to the interior allowing the exterior façade to remain unbroken. The only two visible interventions from the exterior are constructed with steel and glass and are used to create a new entrance and lounge area.Text description provided by the architects.InEindhoven, the former NRE site has been transformed by De Bever Architecten into a contemporary center. The former site was designed by Architect, Louis J.P. Kooken (1867-1940), founder of De Bever Architecten, as a gas factory with a specific architectural quality.The central building is known as ‘’Building 5”, which the client Okko Project initiated to repurpose into a jazz club with a restaurant, café, and coffee roaster. Keeping the monumental quality and existing architectural details was important, therefore the approach was to minimize the appearance of interventions.To effectively use the existing building a clear routing was established. The routing integrates the new functions with the existing and new architecture by unifying the spaces with clear spatial connections throughout the building. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
