logo
ProjectClosed

Fifth Power System Development Project

One of 10,000+ projects Taiyo tracks in India.

Source: World Bank

The objective of the Fifth Power System Development Project for India is to strengthen India's electricity transmission system in order to increase reliable power exchange between regions and states. The project will consist of one component, namely regional transmission schemes for strengthening of Western, Northern and Southern region transmission systems, and the interregional power exchange fo

Status
Closed
Sector
Power Generation (CCGT), Government
Location
India
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Fifth Power System Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Fifth Power System Development Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Fifth Power System Development Project for India is to strengthen India's electricity transmission system in order to increase reliable power exchange between regions and states. The project will consist of one component, namely regional transmission schemes for strengthening of Western, Northern and Southern region transmission systems, and the interregional power exchange for the national grid. Indeed, the first three schemes are being constructed to meet the demand in the Western and Northern regions where the Sasan Ultra Mega Power Project (UMPP) and Mundra UMPP are physically located. Both plants are expected to be commissioned in 2012-13, to facilitate the exchange of power between regions, the transmission networks have to be strengthened in the Western, Northern and Central part of the national grid system, as the difference in demand profiles across regions requires large bulk power transfers over short periods of time and the transmission networks need to have significant available transfer capacity to sustain these. Fourth scheme will meet the power demand within southern region and will transfer the power to load centers in the Western region. The fifth scheme, the South-West interconnection, will transfer power surpluses in the Southern region to deficit regions in the Western region.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

India

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project