logo

Fifth Power System Development Project

Sector: Power Generation (CCGT) • Location: India

Source: World Bank Group

Project
Closed

The objective of the Fifth Power System Development Project for India is to strengthen India's electricity transmission system in order to increase reliable power exchange between regions and states. The project will consist of one component, namely regional transmission schemes for strengthening of Western, Northern and Southern region transmission systems, and the interregional power exchange fo

Project Information FAQ

Project Information

5 Q
The project “Fifth Power System Development Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Fifth Power System Development Project for India is to strengthen India's electricity transmission system in order to increase reliable power exchange between regions and states. The project will consist of one component, namely regional transmission schemes for strengthening of Western, Northern and Southern region transmission systems, and the interregional power exchange for the national grid. Indeed, the first three schemes are being constructed to meet the demand in the Western and Northern regions where the Sasan Ultra Mega Power Project (UMPP) and Mundra UMPP are physically located. Both plants are expected to be commissioned in 2012-13, to facilitate the exchange of power between regions, the transmission networks have to be strengthened in the Western, Northern and Central part of the national grid system, as the difference in demand profiles across regions requires large bulk power transfers over short periods of time and the transmission networks need to have significant available transfer capacity to sustain these. Fourth scheme will meet the power demand within southern region and will transfer the power to load centers in the Western region. The fifth scheme, the South-West interconnection, will transfer power surpluses in the Southern region to deficit regions in the Western region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data