FIFTH POWER
One of 1,917 projects Taiyo tracks in Panama.
Source: World Bank Group
The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribu
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Panama
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about FIFTH POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribution expansion required to connect new consumers in 1981-82. In addition, the project would include technical services to strengthen IRHE's planning and design of distribution and subtransmission works. Specifically, the project would consist of: (a) rehabilitation and construction of about 535 circuit km of lines; (b) installation of about 135 MVA of transformers in existing substations and in new substations to be constructed; (c) installation of accessory subtransmission equipment; (d) construction of about 100 circuit km of lines and 260 km of distribution networks; (e) installation of about 3,300 distribution transformers with a total capacity of about 100 MVA; (f) installation of accessory distribution equipment; and (g) consulting services. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Panama |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Panama
- Costa Norte Gas-fired Thermal Power Plant and LNG Terminal Project
- Desarrollo Sostenible de Escuelas Primarias en Áreas Rurales de Panamá
- Naturgy Panama: Covid-19 Working Capital Loan
- San Lorenzo
- Termica del Noreste S.A. II
- Lloyds TSB Bank plc Panama Branch
- DOS MARES HYDROELECTRIC PLANT
- Costa Norte LNG Terminal, Colon
