logo

FIFTH POWER

Sector: Power Generation (CCGT) • Location: Panama

Source: World Bank Group

Project
Closed

The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribu

Project Information FAQ

Project Information

5 Q
The project “FIFTH POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Panama. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribution expansion required to connect new consumers in 1981-82. In addition, the project would include technical services to strengthen IRHE's planning and design of distribution and subtransmission works. Specifically, the project would consist of: (a) rehabilitation and construction of about 535 circuit km of lines; (b) installation of about 135 MVA of transformers in existing substations and in new substations to be constructed; (c) installation of accessory subtransmission equipment; (d) construction of about 100 circuit km of lines and 260 km of distribution networks; (e) installation of about 3,300 distribution transformers with a total capacity of about 100 MVA; (f) installation of accessory distribution equipment; and (g) consulting services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data