logo
ProjectClosed

FIFTH POWER

One of 1,917 projects Taiyo tracks in Panama.

Source: World Bank Group

The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribu

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Panama
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about FIFTH POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “FIFTH POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Panama. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribution expansion required to connect new consumers in 1981-82. In addition, the project would include technical services to strengthen IRHE's planning and design of distribution and subtransmission works. Specifically, the project would consist of: (a) rehabilitation and construction of about 535 circuit km of lines; (b) installation of about 135 MVA of transformers in existing substations and in new substations to be constructed; (c) installation of accessory subtransmission equipment; (d) construction of about 100 circuit km of lines and 260 km of distribution networks; (e) installation of about 3,300 distribution transformers with a total capacity of about 100 MVA; (f) installation of accessory distribution equipment; and (g) consulting services.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Panama

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project