FIFTH POWER
Sector: Power Generation (CCGT) • Location: Panama
Source: World Bank Group
The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribu
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project would consist of a program designed to rehabilitate and expand IRHE's subtransmission and distribution systems in the 1980-83 period. It represents the least-cost alternative to supplying new customers and rehabilitating obsolete distribution and subtransmission facilities. The project would include 38 specific subprojects which would be executed during 1980-83 and the routine distribution expansion required to connect new consumers in 1981-82. In addition, the project would include technical services to strengthen IRHE's planning and design of distribution and subtransmission works. Specifically, the project would consist of: (a) rehabilitation and construction of about 535 circuit km of lines; (b) installation of about 135 MVA of transformers in existing substations and in new substations to be constructed; (c) installation of accessory subtransmission equipment; (d) construction of about 100 circuit km of lines and 260 km of distribution networks; (e) installation of about 3,300 distribution transformers with a total capacity of about 100 MVA; (f) installation of accessory distribution equipment; and (g) consulting services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in Panama
- Costa Norte Gas-fired Thermal Power Plant and LNG Terminal Project
- Desarrollo Sostenible de Escuelas Primarias en Áreas Rurales de Panamá
- DOS MARES HYDROELECTRIC PLANT
- Naturgy Panama: Covid-19 Working Capital Loan
- San Lorenzo
- Termica del Noreste S.A. II
- Lloyds TSB Bank plc Panama Branch
- Panama Metro Line One
