Fifth-Third Bank Make-Ready Utility Improvements
Sector: Water Supply and Storage • Location: Morton Grove, Illinois, United States of America
Source: Dodge
The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required install approximately 36 feet of 10-inch storm sewer service pipe; connect storm sewer pipe to combination sewer; disconnect 1-1/2-inch diameter water service from water main; pressure connection and 5-foot diameter valve vault to existing 12-inch water main; install approxim
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Car parking, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial, Automotive
- Location
- Morton Grove, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fifth-Third Bank Make-Ready Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required install approximately 36 feet of 10-inch storm sewer service pipe; connect storm sewer pipe to combination sewer; disconnect 1-1/2-inch diameter water service from water main; pressure connection and 5-foot diameter valve vault to existing 12-inch water main; install approximately 54 feet of 6-inch diameter water main pipe; install approximately 21 feet of 12-inch diamet... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Morton Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Car parking, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial, Automotive |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
