Filiberto's Drive-Thru Restaurant
Sector: Water Supply and Storage • Location: Phoenix, Arizona, United States of America
Source: Dodge
The project is an approximately 1,964-square-foot ground-up restaurant. The project includes a complete wood-framed shell and interior improvements. Minimal site work will be required. The pad is currently a parking lot and no off-site work/improvements in the streets shall be required. The water is already tapped in 16th St and stubbed to the parcel with the meter box ready for the new water mete
- Status
- Closed
- Sector
- Water Supply and Storage, Consumer Products, Road, Car parking, Automotive, Commercial, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Filiberto's Drive-Thru Restaurant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is an approximately 1,964-square-foot ground-up restaurant. The project includes a complete wood-framed shell and interior improvements. Minimal site work will be required. The pad is currently a parking lot and no off-site work/improvements in the streets shall be required. The water is already tapped in 16th St and stubbed to the parcel with the meter box ready for the new water meter., The project sewer main is stubbed to the pad and ready to just tie into. Electric and gas wil... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Road, Car parking, Automotive, Commercial, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
