Final Denial Barriers South Gate
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
Scope - Construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick, reconfiguration of the existing road network to accommodate traffic queuing/calming measures, signage, active/passive barriers, curbs, sidewalk, site lighting,
- Status
- Closed
- Sector
- Telecommunications, Power Transmission, Power Generation (CCGT), Road, Seaport, Car parking, Commercial, Automotive, Manufacturing (Industrial)
- Location
- Satellite Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Final Denial Barriers South Gate
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - Construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick, reconfiguration of the existing road network to accommodate traffic queuing/calming measures, signage, active/passive barriers, curbs, sidewalk, site lighting, utilities and all other infrastructure for a complete and usable system fully compliant with UFC... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Satellite Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Power Transmission, Power Generation (CCGT), Road, Seaport, Car parking, Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
