Finkwiller School Group / rhb architectes
Sector: Road • Location: ES SERVICES ENERGETIQUES, SAS BIM
Source: ArchDaily
The cafeterias are positioned on the ground floor, benefiting from several diverse views of the exterior. On the first floor, a hall articulates the existing primary school with the program positioned in the extension. It grants views on both interior and exterior areas via double heights. The multifunctional room appears as an emergence in the project, easily visible from Finkwiller Street. The a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The cafeterias are positioned on the ground floor, benefiting from several diverse views of the exterior. On the first floor, a hall articulates the existing primary school with the program positioned in the extension. It grants views on both interior and exterior areas via double heights. The multifunctional room appears as an emergence in the project, easily visible from Finkwiller Street. The activities which take place in the room are showcased through a generous glass façade. Finally, the covered courtyard offers a transition between the interior spaces and the playground. The structure also functions as a terrace arranged for a vegetable garden, accessible from the school playground.Text description provided by the architects.The extension project of Finkwiller School takes place at the heart of a heterogeneous urban environment, remarkable for its strong cultural and architectural identity. The school, whose construction dates back to the 1960s, is set in close proximity to important historical elements, such as the historic stone wall circling the playground, the nearby famous Ponts Couverts, and the river Ill.The structure above the playground creates multiple layers at different levels, offering ample sun protection. Glass surfaces have roller blinds linked to weather sensors. Natural ventilation is provided through air inlets and roof windows for efficient airflow. The playground has a minimal asphalt perimeter for accessibility and safety. The rest is made of permeable surfaces that absorb rain. A vegetated mound separates the asphalt from the play area, with vegetable gardens along it. A paved lawn marks the boundary near the school.The project is designed with respect to the existing architectural heritage. The extension, which most notably houses a cafeteria intended for the children of the nursery and primary school, is implanted along Finkwiller Street and acts as a common interface between both schools, highlighted by a patio. The concept is to create a layered piece of architecture that "emerges" from the playground. These layers shift from one another to subtly weave the link between both school buildings. The overall architectural expression aims to be porous and largely vegetated. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
