Finsterwalde Data Centre Project
Sector: Energy Storage • Location: Finsterwalde, Germany
Source: Construction Digital
A 500MW hyperscale data centre project in Finsterwalde, Germany, being advanced by WBS Power to meet growing demand for hyperscale capacity. The project leverages WBS Power's experience in energy infrastructure including renewables, battery storage, and high-voltage grid installations.
- Status
- Under Construction
- Sector
- Energy Storage, Data Center, Power Generation (CCGT), Power Transmission
- Location
- Finsterwalde, Germany
- Updated
- 22 Jul 2026
- Source
- Construction Digital
ConstructChat
Ask ConstructChat about Finsterwalde Data Centre Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 500MW hyperscale data centre project in Finsterwalde, Germany, being advanced by WBS Power to meet growing demand for hyperscale capacity. The project leverages WBS Power's experience in energy infrastructure including renewables, battery storage, and high-voltage grid installations. |
Original sector | Digital Infrastructure |
Location
Country | Germany |
City | Finsterwalde |
Source
Source | Construction Digital |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Data Center, Power Generation (CCGT), Power Transmission |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
