In 2001, Brazilian Government institute Fiocruz Instituto de Tecnologia em Imunobiologicos completed one of the largest vaccine manufacturing centres in Latin America. 1998 Plant expansion Manguinhos, Brazil $40 million 2001 Vaccines, 180 million doses per annum Fiocruz Instituto de Technologia em Imunobiologicos Arch Machines Inc., B Braun Biotech, Termo Engenharia Ltda Brazilian government In 20

Project Information FAQ

Project Information

4 Q
The project “Fiocruz’s Vaccine Manufacturing Centre, Manguinhos, Brazil” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2001, Brazilian Government institute Fiocruz Instituto de Tecnologia em Imunobiologicos completed one of the largest vaccine manufacturing centres in Latin America. 1998 Plant expansion Manguinhos, Brazil $40 million 2001 Vaccines, 180 million doses per annum Fiocruz Instituto de Technologia em Imunobiologicos Arch Machines Inc., B Braun Biotech, Termo Engenharia Ltda Brazilian government In 2001, Brazilian Government institute Fiocruz Instituto de Tecnologia em Imunobiologicos completed one of the largest vaccine manufacturing centres in Latin America. Located in Manguinhos, Brazil, the plant is capable of processing 180 million doses per year of vaccines against yellow fever, smallpox, tuberculosis, typhoid fever and measles. Diptheria, pertussis and tetanus vaccine (DPT) and meningitis vaccines were added to the facilities repertoire in late 2002. The facility expansion required an investment of $40 million. The Fiocruz facility is part of an existing vaccine technological complex comprised of a bacterial vaccines production unit, a centre of final processing, and a viral vaccine production unit. The viral vaccine production plant was later expanded in April 2003 to allow the production of measles, mumps and rubella (MMR) vaccine at the facility. The Fiocruz complex aims to meet the Brazilian public’s demand for vaccines and to supply new international markets with surplus vaccines and hyperimmune sera. Fiocruz has striven to develop a capability to produce vaccines in bulk quantities and form partnerships with large multinational pharmaceutical companies in order to serve the global market. To achieve this objective, the institute placed emphasis on good manufacturing practices (GMP) standards. In April 2003, Fiocruz and GSK signed a technology transfer agreement to produce 100 million doses of MMR vaccine to vaccinate children in Brazil. The technology transfer will occur over a period of five years and Fiocruz will manufacture the vaccine in Brazil and be responsible for its commercialisation in the country. The contractors for the Fiocruz expansion in 2000 included ARC Machines, which provided orbital welding equipment for the fabrication of the vaccine production facility. The bioreactors were supplied and installed by B Braun Biotech of Germany, while the engineering contractor was Termo Engenharia (TEL). The site expansion in 2000 included the construction of a DPT building with a class 100,000 fermentation room, which was designed for producing bacterial vaccines. Piping was also installed for delivering chilled water, deionised (DI) water, water for injection (WFI), 95°C water, and compressed air for cleaning, rinsing and drying activities. A centre for final processing (CPFI) was also completed (2001) for filling, lyophilisation and packaging of the final products into vials and ampoules. In addition, many utility buildings supporting the infrastructure were constructed, including a building for water treatment (which processes water into deionized water), one for chilled water and another for steam generation. The Manguinhos site is managed by Bio-Manguinhos, a technology institute of immunology created by Fiocruz. A public organisation, it is recognised as the largest Brazilian manufacturer of immunobiological drugs and is considered one of the major technological reference bodies for immuno-biologicals in South America. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data