Fire Flow Improvements Phase 5 Peterson Farms
Sector: Water Supply and Storage • Location: Gilbert, Arizona, United States of America
Source: Dodge
Design and construction of fire flow improvements within the Peterson Farms neighborhood area. The project will include 2,600 lineal feet of 12" ductile Iron pipe (DIP) and 125 lineal feet of 8" DIP to meet fire flow criteria.
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Government, Steel, Metal, Commercial
- Location
- Gilbert, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fire Flow Improvements Phase 5 Peterson Farms
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and construction of fire flow improvements within the Peterson Farms neighborhood area. The project will include 2,600 lineal feet of 12" ductile Iron pipe (DIP) and 125 lineal feet of 8" DIP to meet fire flow criteria. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Gilbert |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Government, Steel, Metal, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
