Fire Flow Package 2 Water Main Replacement
Sector: Metal • Location: Miami Beach, Florida, United States of America
Source: Dodge USA
The scope of Work for the above-referenced Fire Flow Projects is as recommended in the City's Water System Master Plan dated October 2019 for fire flow improvements within the Flamingo and City Center Neighborhoods. The work includes upsizing approximately 6,140 LF of existing water mains to of 6 , 8 , 12 , and 16 diameter zinc-coated and polywrapped ductile iron pipe to meet fire flow pressures.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of Work for the above-referenced Fire Flow Projects is as recommended in the City's Water System Master Plan dated October 2019 for fire flow improvements within the Flamingo and City Center Neighborhoods. The work includes upsizing approximately 6,140 LF of existing water mains to of 6 , 8 , 12 , and 16 diameter zinc-coated and polywrapped ductile iron pipe to meet fire flow pressures. The Work to be performed under this Contract shall consist of furnishing all equipment, materials... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Metal projects in United States of America
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- Crystal City Substation Improvement and Expansion
