Fire House 4 - Drainage Improvements
Closed · New York · Last reported Oct 2025
Source: Dodge
Phase 001 Analysis and Development of Conceptual Solutions As part of this phase, the City expects to be presented with a formal engineering analysis and discrete drainage improvement options along with estimated construction cost. A minimum of two drainage improvement options shall be considered and presented. Consultants shall include all necessary due diligence in their scope of work as require
- Status
- Closed
- Sector
- Waste Processing and Treatment, Raw Materials, Water Supply and Storage, Commercial, Government
- Location
- New Rochelle, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fire House 4 - Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 001 Analysis and Development of Conceptual Solutions As part of this phase, the City expects to be presented with a formal engineering analysis and discrete drainage improvement options along with estimated construction cost. A minimum of two drainage improvement options shall be considered and presented. Consultants shall include all necessary due diligence in their scope of work as required to analyze the flooding conditions at F.H.#4 basement. Mapping of City-owned drainage infrastru... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New Rochelle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Raw Materials, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
