Fire Hydrant & Valve Replacement - Phase 1
Sector: Commercial • Location: Germantown, Ohio, United States of America
Source: Dodge USA
A. Phase 1 of the project consists of removing pavement, walk and curb/curb & gutter; excavation of trench for installation of EZ Valves (supplied and installed by the City) at locations as shown on the drawings; backfill; replacement of pavement, walk and curb/curb & gutter; and site restoration. B. Phase 2 of the project consists of removing pavement, walk and curb/curb & gutter; excavation of t
- Status
- Closed
- Sector
- Commercial, Car parking, Road, Automotive, Government
- Location
- Germantown, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Hydrant & Valve Replacement - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. Phase 1 of the project consists of removing pavement, walk and curb/curb & gutter; excavation of trench for installation of EZ Valves (supplied and installed by the City) at locations as shown on the drawings; backfill; replacement of pavement, walk and curb/curb & gutter; and site restoration. B. Phase 2 of the project consists of removing pavement, walk and curb/curb & gutter; excavation of trench; removal of existing and installation of new fire hydrants and watch dog valves; backfill; ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Germantown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Road, Automotive, Government |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
