Fire Hydrant Replacements Districts 2 & 5
Sector: Water Supply and Storage • Location: Columbia, South Carolina, United States of America
Source: Dodge USA
hese projects include the Replacement for Existing Fire Hydrants within the City of Columbia Service Area. Two (2) projects will be bid. This project will include the Fire Hydrant Replacements in Water Districts 2 & 5 and the other project will include the Fire Hydrant Replacements in Water Districts 1 & 4. Water District 3 Fire Hydrant Replacements will be completed by City Forces.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Columbia, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Hydrant Replacements Districts 2 & 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | hese projects include the Replacement for Existing Fire Hydrants within the City of Columbia Service Area. Two (2) projects will be bid. This project will include the Fire Hydrant Replacements in Water Districts 2 & 5 and the other project will include the Fire Hydrant Replacements in Water Districts 1 & 4. Water District 3 Fire Hydrant Replacements will be completed by City Forces. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Columbia |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
