Fire Lake Mining

Sector: Metal • Location: Canada

Source: Bird Construction

Project
Unknown

Since 2006, les Entreprises de Construction de Québec (LECQ), a division of Bird, has been continuously operating the Fire Lake iron ore mine for ArcelorMittal. The scope of work includes the drilling, blasting, hauling and loading of the ore into railcars to be transported to Mont-Wright, 55-kilometres north. There is only one track between the two sites and it is LECQ’s job to ensure that there

Project Information FAQ

Project Information

3 Q
The project “Fire Lake Mining” is an infrastructure initiative in the Metal sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Since 2006, les Entreprises de Construction de Québec (LECQ), a division of Bird, has been continuously operating the Fire Lake iron ore mine for ArcelorMittal. The scope of work includes the drilling, blasting, hauling and loading of the ore into railcars to be transported to Mont-Wright, 55-kilometres north. There is only one track between the two sites and it is LECQ’s job to ensure that there is a continuous flow of ore from one to the other. For over the past eight years, the supply of ore to Mont-Wright has not been disrupted. Due to the remote location of Fire Lake, LECQ operates and maintains the worker’s camp. The Fire Lake site is an important contributor to ArcelorMittal’s total iron ore production in the area and represents 10 to 15% of their total iron production in the region annually. Production targets for 2014 are the highest since the mine went into operation — 6,200,000 tonnes of iron ore, 840,000 tonnes of waste rock and 600,000 tonnes of overburden material are forecast for 2014. Historically, the mine has used nine-cubic-yard excavators with 70-ton trucks. However, to achieve the increased 2014 quantities, LECQ has mobilized a 15-cubic-yard excavator and 100-ton trucks.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data