logo
ProjectUnknown

Fire Lake Mining

The status, timeline and source of this project. A free account opens every field.

Source: Bird Construction

Since 2006, les Entreprises de Construction de Québec (LECQ), a division of Bird, has been continuously operating the Fire Lake iron ore mine for ArcelorMittal. The scope of work includes the drilling, blasting, hauling and loading of the ore into railcars to be transported to Mont-Wright, 55-kilometres north. There is only one track between the two sites and it is LECQ’s job to ensure that there

Status
Unknown
Sector
Metal, Road, Steel
Location
Canada
Updated
22 Jul 2026
Source
Bird Construction

ConstructChat

Ask ConstructChat about Fire Lake Mining

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Fire Lake Mining” is an infrastructure initiative in the Metal sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Participants

Company

Status

Original status

unknown

Taiyo status

Unknown

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Since 2006, les Entreprises de Construction de Québec (LECQ), a division of Bird, has been continuously operating the Fire Lake iron ore mine for ArcelorMittal. The scope of work includes the drilling, blasting, hauling and loading of the ore into railcars to be transported to Mont-Wright, 55-kilometres north. There is only one track between the two sites and it is LECQ’s job to ensure that there is a continuous flow of ore from one to the other. For over the past eight years, the supply of ore to Mont-Wright has not been disrupted. Due to the remote location of Fire Lake, LECQ operates and maintains the worker’s camp. The Fire Lake site is an important contributor to ArcelorMittal’s total iron ore production in the area and represents 10 to 15% of their total iron production in the region annually. Production targets for 2014 are the highest since the mine went into operation — 6,200,000 tonnes of iron ore, 840,000 tonnes of waste rock and 600,000 tonnes of overburden material are forecast for 2014. Historically, the mine has used nine-cubic-yard excavators with 70-ton trucks. However, to achieve the increased 2014 quantities, LECQ has mobilized a 15-cubic-yard excavator and 100-ton trucks.

Location

Country

Canada

Source

Source reliability

High

Source

Bird Construction

URL

More Details

Record type

Project

Sector

Metal, Road, Steel

Article published date

2023-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project