Fire Safety Modernization
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Summary of Work, and includes the following principal features: 1. Selective Demolition. 2. Relocation of piping and ductwork. 3. Clearing and grubbing. 4. Earthwork. 5. Aggregate base and hot mix asphalt. 6. Reinforced concrete, including foundations and slabs, and reinforced concrete masonry. 7. Structural steel and cold-formed metal framing. 8. Miscellaneous metal, metal stairs and handrails. 9
- Status
- Closed
- Sector
- Metal, Cement, Power Generation (CCGT), Road, Steel, Commercial
- Location
- Los Banos, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Safety Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Summary of Work, and includes the following principal features: 1. Selective Demolition. 2. Relocation of piping and ductwork. 3. Clearing and grubbing. 4. Earthwork. 5. Aggregate base and hot mix asphalt. 6. Reinforced concrete, including foundations and slabs, and reinforced concrete masonry. 7. Structural steel and cold-formed metal framing. 8. Miscellaneous metal, metal stairs and handrails. 9. Sheet metal flashing and trim. 10. Fire stopping and joint sealant. 11. Metal doors, frames, an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Banos |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Power Generation (CCGT), Road, Steel, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
