Fire Station 10 Renovations
Sector: Power Generation (CCGT) • Location: Lexington, South Carolina, United States of America
Source: Dodge USA
The work generally consists of adding a fire sprinkler system to the facility, demolishing walls, floors and ceilings noted and providing new bathrooms and showers including all plumbing, electrical and mechanical work along with miscellaneous work as described in the construction documents.
- Status
- Closed
- Sector
- Power Generation (CCGT), Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Lexington, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Station 10 Renovations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of adding a fire sprinkler system to the facility, demolishing walls, floors and ceilings noted and providing new bathrooms and showers including all plumbing, electrical and mechanical work along with miscellaneous work as described in the construction documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Lexington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
