Fire Station 3 Kitchen Remodel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
- Removal and disposal of all existing materials. 2. Asbestos Abatement Attachment B is the asbestos inspection report completed by Ideal Environmental Engineering, Inc. All asbestos containing materials found within the construction area as outlined in the report will need to be professionally and properly removed and disposed of by a properly trained and licensed asbestos abatement company. A c
- Status
- Closed
- Sector
- Consumer Products, Rail, Government, Commercial, Manufacturing (Industrial)
- Location
- Bloomington, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Station 3 Kitchen Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Removal and disposal of all existing materials. 2. Asbestos Abatement Attachment B is the asbestos inspection report completed by Ideal Environmental Engineering, Inc. All asbestos containing materials found within the construction area as outlined in the report will need to be professionally and properly removed and disposed of by a properly trained and licensed asbestos abatement company. A copy of the abatement scope of work shall be supplied to the City of Bloomington and CIRA. 3. Appl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Bloomington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Rail, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
