Fire Station 3 Site Analysis
Sector: Manufacturing (Industrial) • Location: Fredericksburg, Virginia, United States of America
Source: Dodge
Architect/Engineer (A/E) consultants to be part of a team to perform professional services for the design of the new Fire Station. Design services shall include landscape design, architectural design, interior design, structural engineering, site civil, plumbing, mechanical, electrical, and telecommunication engineering services. New Fire Station, the intended site is a cityowned parcel located at
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial, Telecommunications
- Location
- Fredericksburg, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fire Station 3 Site Analysis
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Architect/Engineer (A/E) consultants to be part of a team to perform professional services for the design of the new Fire Station. Design services shall include landscape design, architectural design, interior design, structural engineering, site civil, plumbing, mechanical, electrical, and telecommunication engineering services. New Fire Station, the intended site is a cityowned parcel located at 3340 Fall Hill Avenue [GPIN 7779-09-1114] at the southwest corner of the intersection of Fall Hi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Fredericksburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial, Telecommunications |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
