Fire Station #4 - Celina, TX
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
13,375 Sq. ft - New 3 bay fire station with capacity for 11 fire personnel and support spaces, including storm shelter Providing architectural services in connection with the design of Fire Station 4. The station will have three pull-through apparatus bays with overhead entry doors and bi-fold exit doors with metal security gates on the roll-up entry doors. The station will include 100% generator
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Steel, Government, Metal
- Location
- Celina, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fire Station 4 - Celina, TX
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 13,375 Sq. ft - New 3 bay fire station with capacity for 11 fire personnel and support spaces, including storm shelter Providing architectural services in connection with the design of Fire Station 4. The station will have three pull-through apparatus bays with overhead entry doors and bi-fold exit doors with metal security gates on the roll-up entry doors. The station will include 100% generator backup and a fueling station on site. The project scope includes a 12,000 SF building, ten sleepi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Celina |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Steel, Government, Metal |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
