Fire Station 4 Site Improvements REBID
Sector: Water Supply and Storage • Location: West Orange, New Jersey, United States of America
Source: Dodge USA
The project will generally consist of the reconstruction of the pavement at the rear and front of the building, with the construction of two additional parking spaces. Also included is the construction of a walkway to provide accessible access to the Pleasant Valley Way entrance to the building. Other work includes construction of a new trench drain an inlet with a connection to the existing storm
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Consumer Products, Car parking, Government, Waste Processing and Treatment, Manufacturing (Industrial), Automotive, Commercial
- Location
- West Orange, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Station 4 Site Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will generally consist of the reconstruction of the pavement at the rear and front of the building, with the construction of two additional parking spaces. Also included is the construction of a walkway to provide accessible access to the Pleasant Valley Way entrance to the building. Other work includes construction of a new trench drain an inlet with a connection to the existing stormwater drainage system as well as other related improvements. The project includes replacement of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | West Orange |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Consumer Products, Car parking, Government, Waste Processing and Treatment, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
