logo

Fire Station 5 Update

Sector: Manufacturing (Industrial) • Location: High Point, North Carolina, United States of America

Source: Dodge

Project
Pre-Design

Fire Station was built in 1993. Currently it does not meet ADA compliance, HVAC needs to be replaced. Kitchen and living areas need to be updated along with Bay doors that continue to have maintenance issues. Ranked 19

Status
Prospective
Sector
Manufacturing (Industrial), Commercial, Government
Location
High Point, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Fire Station 5 Update

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fire Station 5 Update” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in High Point, North Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fire Station was built in 1993. Currently it does not meet ADA compliance, HVAC needs to be replaced. Kitchen and living areas need to be updated along with Bay doors that continue to have maintenance issues. Ranked 19

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

High Point

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project