Fire Station 8 Replacement
Sector: Metal • Location: Corpus Christi, Texas, United States of America
Source: Dodge
FIRE STATION 8 WILL BE A NEWLY CONSTRUCTED STEEL AND COLD-FORMED METAL STRUCTURE WITH CMU WALLS IN THE APPARATUS BAY AREA. IT WILL HAVE THE CAPACITY TO HOUSE 10 FIRE FIGHTERS WITH FULL LIVING QUARTERS AND HAS 3 PULL-THROUGH APPARATUS BAYS, WEIGHT ROOM, REPORT WRITING WATCH OFFICE, AND SUPPORT SPACE. THE SITE INCLUDES 4 PUBLIC PARKING SPACES, WITH 1 BEING ACCESSIBLE, 16 EMPLOYEE PARKING SPACES, SID
- Status
- Closed
- Sector
- Metal, Steel, Government, Residential, Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Corpus Christi, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fire Station 8 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | FIRE STATION 8 WILL BE A NEWLY CONSTRUCTED STEEL AND COLD-FORMED METAL STRUCTURE WITH CMU WALLS IN THE APPARATUS BAY AREA. IT WILL HAVE THE CAPACITY TO HOUSE 10 FIRE FIGHTERS WITH FULL LIVING QUARTERS AND HAS 3 PULL-THROUGH APPARATUS BAYS, WEIGHT ROOM, REPORT WRITING WATCH OFFICE, AND SUPPORT SPACE. THE SITE INCLUDES 4 PUBLIC PARKING SPACES, WITH 1 BEING ACCESSIBLE, 16 EMPLOYEE PARKING SPACES, SIDEWALKS, AND A DESIGNATED SCREENED TRASH RECEPTACLE AREA. TO SUPPORT THE BUILDING, THERE WILL BE A... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Corpus Christi |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Government, Residential, Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
