logo

Fire Station in Straubenhardt / wulf architekten

Sector: Cement • Location: Germany

Source: ArchDaily

Project
Closed

Using recyclable materials that are low in harmful substances and can be easily separated and reused when dismantled, the building is a valuable raw material supplier and future material resource. The new fire station, one of the first »Cradle to Cradle« buildings in all of Germany, is a trailblazing building whose exemplary character acts as an important stimulus for future developments.Inside ar

Project Information FAQ

Project Information

4 Q
The project “Fire Station in Straubenhardt / wulf architekten” is an infrastructure initiative in the Cement sector, located in Germany. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Using recyclable materials that are low in harmful substances and can be easily separated and reused when dismantled, the building is a valuable raw material supplier and future material resource. The new fire station, one of the first »Cradle to Cradle« buildings in all of Germany, is a trailblazing building whose exemplary character acts as an important stimulus for future developments.Inside are the garage for the firefighting vehicles and all the facilities required for operations, as well as storage and technical areas. The open-air intermediate level has two atriums and captures the surrounding landscape. It is reached along an external ramp and serves as a parking deck and an area for events. Raised above this is a wooden structure wrapped in a homogeneous facade of white expanded metal. It accommodates a classroom, office areas, and other shared spaces. The stacking of the different functional zones is clearly recognizable from the outside, creating a distinctive appearance that establishes a strong identity.The separation and stacking of the individual functional levels and the use of the site’s sloping terrain are part of the fundamental design concept. As a result, the sealed soil surface could be minimized and, moreover, the building structure nestles harmoniously into the topography. The massive concrete plinth is cut into the slope and the north-facing facade opens to the street.Text description provided by the architects.The new fire station brings together six previously independent firefighting units at one strategically located site on Langenalberstraße. The project was designed with the goal of implementing circular construction and sustainable planning in accordance with the »Cradle to Cradle« principle.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data