Fire Station No. 3
Bid results · North Carolina · Last reported Jul 2024
Source: Dodge USA
The Project consists generally of the following major items: 1. Construction of as new 11,105 sf fire station and other Work indicated in the Contract Documents. Work includes masonry cavity walls, structural steel roof framing, modified bituminous membrane and structural standing seam roofing, hollow metal doors and frames, flush wood doors, non-load-bearing steel framing and gypsum board interio
- Status
- Closed
- Sector
- Metal, Cement, Steel, Government, Commercial, Manufacturing (Industrial)
- Location
- Raleigh, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Station No. 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists generally of the following major items: 1. Construction of as new 11,105 sf fire station and other Work indicated in the Contract Documents. Work includes masonry cavity walls, structural steel roof framing, modified bituminous membrane and structural standing seam roofing, hollow metal doors and frames, flush wood doors, non-load-bearing steel framing and gypsum board interior walls, acoustical panel ceilings, and bi-folding and roll-up fire bay doors. Interior work also... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Raleigh |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Steel, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
