Fire Station No 7 Site Preparation
Sector: Government • Location: Ventura, California, United States of America
Source: Dodge USA
The project consists of demolition and removal of the existing water softening plant, which includes removing and disposing of underground and above ground water storage steel tanks, tank foundations, associated piping, valves, concrete vault, as shown on the contract plans, backfilling and compaction, and in accordance with the project specifications.
- Status
- Closed
- Sector
- Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Metal, Cement, Steel
- Location
- Ventura, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Station No 7 Site Preparation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of demolition and removal of the existing water softening plant, which includes removing and disposing of underground and above ground water storage steel tanks, tank foundations, associated piping, valves, concrete vault, as shown on the contract plans, backfilling and compaction, and in accordance with the project specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Ventura |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Metal, Cement, Steel |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
