Fire Station Wind Mitigation Construction Services
Sector: Wind • Location: Tavares, Florida, United States of America
Source: Dodge
1.1.Be licensed and fully competent in all aspects of building renovation in a safe manner. 1.1.1.Employ only skilled, qualified workers. 1.2.Provide all-inclusive quotes to provide 100% turnkey projects that include replacement of roofing, exterior doors, windows, glazing, exterior louvers and vents, soffit, and various repairs at 19 fire stations throughout Lake County. 1.2.1.Include all require
- Status
- Prospective
- Sector
- Wind, Government, Commercial, Manufacturing (Industrial)
- Location
- Tavares, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fire Station Wind Mitigation Construction Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.1.Be licensed and fully competent in all aspects of building renovation in a safe manner. 1.1.1.Employ only skilled, qualified workers. 1.2.Provide all-inclusive quotes to provide 100% turnkey projects that include replacement of roofing, exterior doors, windows, glazing, exterior louvers and vents, soffit, and various repairs at 19 fire stations throughout Lake County. 1.2.1.Include all required labor, material, equipment, manufacturer s installation documentation, permitting and inspectio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tavares |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Wind, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- 110 North Wacker
- Ruby Run Tentative Subdivision Map, Special Development Permit, Affordable Housing Plan and Abandonment
- Meadows Field Airport Taxiway G Rehabilitation and
- Abandonment Of Excess Right-Of-Way Fronting 7721 Winding Way
- Lynn's School of English ZV Letter
- 4212 Winding Way
- Oglala Sioux Tribe Broadband Project
- Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)
