Fire Stations No. 2 4 & 6 - Facility Accommodation Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The City of Clifton Facility Accommodation Upgrades Fire Stations No. 2, 4 & 6: Fire Station No. 2 Station No. 2 is located at 7 Dumont St. Work will consist of an addition of approximately 400 square feet for a dormitory and toilet room. Alterations include new aluminum gutter and fascia system along the perimeter of the facility, including new gutters and downspouts and the installation
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Steel, Government, Commercial, Manufacturing (Industrial)
- Location
- Clifton, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fire Stations No. 2 4 & 6 - Facility Accommodation Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The City of Clifton Facility Accommodation Upgrades Fire Stations No. 2, 4 & 6: Fire Station No. 2 Station No. 2 is located at 7 Dumont St. Work will consist of an addition of approximately 400 square feet for a dormitory and toilet room. Alterations include new aluminum gutter and fascia system along the perimeter of the facility, including new gutters and downspouts and the installation of a storm water system. Interior work is to include the removal and replacement of the existing ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Clifton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Steel, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
