logo

Firefly Solar Project One

Sector: Power Generation (CCGT) • Location: New Castle, Pennsylvania, United States of America

Source: Dodge USA

Project
Planning Schematics

200-megawatt, utility-scale project would be built in North Beaver Township.

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Solar, Commercial
Location
New Castle, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Firefly Solar Project One

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Firefly Solar Project One” is an infrastructure initiative in the Power Generation (CCGT) sector, located in New Castle, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

200-megawatt, utility-scale project would be built in North Beaver Township.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

New Castle

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project