logo
ProjectPlanning Schematics

Firefly Solar Project Two

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Install 200 megawatts either on land already under option in North Beaver or through new leases

Status
Prospective
Sector
Power Generation (CCGT), Solar, Commercial
Location
New Castle, Pennsylvania, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Firefly Solar Project Two

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Firefly Solar Project Two” is an infrastructure initiative in the Power Generation (CCGT) sector, located in New Castle, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Install 200 megawatts either on land already under option in North Beaver or through new leases

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

New Castle

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project