Firestone - Remodel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
INTERIOR SCOPE OF WORK: NEW INTERIOR PARTITIONS FOR NEW CUSTOMER RESTROOMS, BUSINESS OFFICE AND BACK OF HOUSE AREAS. NEW INTERIOR FINISHES THROUGHOUT. NEW PLUMBING FIXTURES NEW ELECTRICAL DEVICES WITH EXISTING ELECTRICAL SERVICE. NEW HVAC SYSTEM EXTERIOR SCOPE OF WORK TO INCLUDE: REPLACE ALL EXTERIOR SIGNAGE PAINT FACADE REPLACE STOREFRONT DOORS REPLACE OVERHEAD DOORS PLACE NEW WALL PACK LIGHTING
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Automotive, Commercial, Power Generation (CCGT), Road
- Location
- Hooksett, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Firestone - Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | INTERIOR SCOPE OF WORK: NEW INTERIOR PARTITIONS FOR NEW CUSTOMER RESTROOMS, BUSINESS OFFICE AND BACK OF HOUSE AREAS. NEW INTERIOR FINISHES THROUGHOUT. NEW PLUMBING FIXTURES NEW ELECTRICAL DEVICES WITH EXISTING ELECTRICAL SERVICE. NEW HVAC SYSTEM EXTERIOR SCOPE OF WORK TO INCLUDE: REPLACE ALL EXTERIOR SIGNAGE PAINT FACADE REPLACE STOREFRONT DOORS REPLACE OVERHEAD DOORS PLACE NEW WALL PACK LIGHTING |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Hooksett |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Automotive, Commercial, Power Generation (CCGT), Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
