Firestone Bl Vision Zero Traffic Safety Enhancements (Phase 1 and Phase 2)
Sector: Road • Location: California, United States of America
Source: LA County Department of Public Work (DPW)
Vision Zero: Phase 1 - Various locations from Central Ave to Alameda St; Install 1 Accessible Pedestrian Signal system; Upgrade 17 traffic signal vehicle heads from 8 inch to 12 inch; Upgrade 8 count-down pedestrian modules.
Phase 2 - Firestone Bl/Maie Av and Firestone Bl/Fir Av; Install high visibility crosswalks and curb extensions (paint and bollard)
- Status
- Under Construction
- Sector
- Road, Government, Residential
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- LA County Department of Public Work (DPW)
ConstructChat
Ask ConstructChat about Firestone Bl Vision Zero Traffic Safety Enhancements (Phase 1 and Phase 2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | development |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vision Zero: Phase 1 - Various locations from Central Ave to Alameda St; Install 1 Accessible Pedestrian Signal system; Upgrade 17 traffic signal vehicle heads from 8 inch to 12 inch; Upgrade 8 count-down pedestrian modules. Phase 2 - Firestone Bl/Maie Av and Firestone Bl/Fir Av; Install high visibility crosswalks and curb extensions (paint and bollard) |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | LA County Department of Public Work (DPW) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Residential |
Article published date | 2024-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
