Firestone Walker Brewery Solar Project
The owner, status and timeline of this project. A free account opens every field.
Source: PV Magazine USA
The Firestone Walker Brewery in California is implementing a 2.1 MW solar project designed by REC Solar to meet its energy demands and sustainability goals. The brewery aims to cover 60 to 80% of its energy needs with solar power, utilizing a portion of its farmland for solar energy generation.
- Status
- Under Construction
- Sector
- Consumer Products, Solar, Commercial, Power Generation (CCGT), Raw Materials
- Location
- Paso Robles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- PV Magazine USA
ConstructChat
Ask ConstructChat about Firestone Walker Brewery Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Firestone Walker Brewery in California is implementing a 2.1 MW solar project designed by REC Solar to meet its energy demands and sustainability goals. The brewery aims to cover 60 to 80% of its energy needs with solar power, utilizing a portion of its farmland for solar energy generation. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | California |
City | Paso Robles |
Source
Source | PV Magazine USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Solar, Commercial, Power Generation (CCGT), Raw Materials |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
