Firestone Walker Brewery Solar Project
Sector: Consumer Products • Location: Paso Robles, California, United States
Source: PV Magazine USA
The Firestone Walker Brewing Company has partnered with REC Solar to implement a 2.1 MW solar power system on their 70-acre property. This initiative aims to cover 60 to 80% of the brewery's energy demand, significantly reducing operational costs and supporting sustainability goals.
- Status
- Under Construction
- Sector
- Consumer Products, Solar, Commercial, Power Generation (CCGT)
- Location
- Paso Robles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- PV Magazine USA
ConstructChat
Ask ConstructChat about Firestone Walker Brewery Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Firestone Walker Brewing Company has partnered with REC Solar to implement a 2.1 MW solar power system on their 70-acre property. This initiative aims to cover 60 to 80% of the brewery's energy demand, significantly reducing operational costs and supporting sustainability goals. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | California |
City | Paso Robles |
Source
Source | PV Magazine USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Solar, Commercial, Power Generation (CCGT) |
Article published date | 2025-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
