First & Elm Truck Route Reconstruction
Sector: Water Supply and Storage • Location: Parkston, South Dakota, United States of America
Source: Dodge USA
Scope - The Project includes but is not limited to: roadway reconstruction and utility installation including approximately 878 ft of concrete curb and gutter, 15604 SqFt of concrete sidewalk, 630 SqYd concrete approach and driveway pavement, 4347 CuYds of unclassified excavation, 5532 Tons of base course, 6053 SqYd of nonreinforced concrete pavement, 1767 tons of asphalt concrete composite, 1832
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Parkston, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about First & Elm Truck Route Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes but is not limited to: roadway reconstruction and utility installation including approximately 878 ft of concrete curb and gutter, 15604 SqFt of concrete sidewalk, 630 SqYd concrete approach and driveway pavement, 4347 CuYds of unclassified excavation, 5532 Tons of base course, 6053 SqYd of nonreinforced concrete pavement, 1767 tons of asphalt concrete composite, 1832 ft of storm sewer, 1661 ft of sanitary sewer, 1287 ft of water main and corresponding miscellaneo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Parkston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
