First Industrial Warehouse at Day Street
Sector: Cement • Location: Moreno Valley, California, United States of America
Source: Dodge
Involves the demolition of an approximately 63,000 SF building and the construction and operation of an approximately 164,968 SF industrial, non-refrigerated warehouse distribution facility, which includes 3,500 SF of office space and 3,500 SF of mezzanine office space on the approximate 8.62-acre (gross) site
- Status
- Prospective
- Sector
- Cement, Warehouse, Road, Residential, Manufacturing (Industrial), Commercial
- Location
- Moreno Valley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about First Industrial Warehouse at Day Street
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Involves the demolition of an approximately 63,000 SF building and the construction and operation of an approximately 164,968 SF industrial, non-refrigerated warehouse distribution facility, which includes 3,500 SF of office space and 3,500 SF of mezzanine office space on the approximate 8.62-acre (gross) site |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Moreno Valley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Warehouse, Road, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
