First Renewable Energy, Transmission and Distribution of Electricity Program
One of 2,672 projects Taiyo tracks in Costa Rica.
Source: Inter-American Development Bank (IADB)
The general objective of the conditional credit line for investment projects (CCLIP) is to contribute to the mitigation of climate change effects, to sustainable economic growth, and to promotion of regional integration through the Regional Electricity Market. The specific objective of the first loan under the CCLIP is to increase the supply of electricity based on renewable energies, through cons
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Costa Rica
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about First Renewable Energy, Transmission and Distribution of Electricity Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | implementation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The general objective of the conditional credit line for investment projects (CCLIP) is to contribute to the mitigation of climate change effects, to sustainable economic growth, and to promotion of regional integration through the Regional Electricity Market. The specific objective of the first loan under the CCLIP is to increase the supply of electricity based on renewable energies, through construction of the Las Pailas II and Borinquen I geothermal power plants and other additional electrical infrastructure. |
Original sector | ENERGY |
Budget |
Location
Country | Costa Rica |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
