First US-Built Small Modular Nuclear Reactors at Palisades
Sector: Power Generation (CCGT) • Location: Covert, Michigan, United States
Source: Detroit Free Press
Holtec International, in collaboration with Hyundai, plans to deploy the first U.S.-manufactured small modular nuclear reactors (SMRs) at the Palisades plant in Michigan by 2030. Each SMR-300 reactor is designed to generate approximately 300 megawatts of energy, enough to power about 300,000 homes, alongside the existing Palisades plant's capacity.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Holtec International, in collaboration with Hyundai, plans to deploy the first U.S.-manufactured small modular nuclear reactors (SMRs) at the Palisades plant in Michigan by 2030. Each SMR-300 reactor is designed to generate approximately 300 megawatts of energy, enough to power about 300,000 homes, alongside the existing Palisades plant's capacity. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
