logo
ProjectUnder Appraisal

FIRST WATER ALLOCATION FL 2025-0375

Sector: Water Supply and Storage • Location: Iceland

Source: European Investment Bank (EIB)

The project supports the construction and operation of land-based salmon farming facilities in an industrial area of Iceland.

The investment covers the construction of production units, acquisition of specialised equipment, and supporting infrastructure including water treatment and processing. It is based on a recirculating aquaculture system for the smolt production and a hybrid flow-through sy

Status
Prospective
Sector
Water Supply and Storage, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Raw Materials
Location
Iceland
Updated
19 Nov 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about FIRST WATER ALLOCATION FL 2025-0375

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “FIRST WATER ALLOCATION FL 2025-0375” is an infrastructure initiative in the Water Supply and Storage sector, located in Iceland. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Not available for this record.

Status

Original status

under appraisal

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project supports the construction and operation of land-based salmon farming facilities in an industrial area of Iceland. The investment covers the construction of production units, acquisition of specialised equipment, and supporting infrastructure including water treatment and processing. It is based on a recirculating aquaculture system for the smolt production and a hybrid flow-through system for the grown-out.

Original sector

Agriculture, fisheries, forestry

Location

Country

Iceland

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Raw Materials

Article published date

2026-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project