Fish House Power Pole Upgrade
Sector: Power Generation (CCGT) • Location: Auburn, Alabama, United States of America
Source: Dodge USA
Scope A new pole with appropriate guide wires will be installed in the same location as the existing pole. Replacement of this pole will require the power supply to fish houses be disconnected. A temporary generator will need to be used to supply power to fish houses while repairs are being made. A new mounting structure for the electrical equipment will also be installed in the same location as t
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Commercial, Raw Materials
- Location
- Auburn, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fish House Power Pole Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope A new pole with appropriate guide wires will be installed in the same location as the existing pole. Replacement of this pole will require the power supply to fish houses be disconnected. A temporary generator will need to be used to supply power to fish houses while repairs are being made. A new mounting structure for the electrical equipment will also be installed in the same location as the existing mounting structure. All work will conform to all relevant and enforceable electrical ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Auburn |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Commercial, Raw Materials |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
