Fish Passage Project at Gorst Creek
Sector: Road • Location: Gorst, Washington, United States
Source: My Northwest
The project involves replacing the fish culvert at Gorst Creek on State Route 3 south of Gorst. The construction requires a full closure of SR 3 for 16 days to allow for the removal and replacement of the highway section to improve fish passage without impacting fish migration, scheduled during the dry summer period.
- Status
- Prospective
- Sector
- Road
- Location
- Gorst, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- My Northwest
ConstructChat
Ask ConstructChat about Fish Passage Project at Gorst Creek
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing the fish culvert at Gorst Creek on State Route 3 south of Gorst. The construction requires a full closure of SR 3 for 16 days to allow for the removal and replacement of the highway section to improve fish passage without impacting fish migration, scheduled during the dry summer period. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Washington |
City | Gorst |
Source
Source | My Northwest |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
