logo

Fish Passage Project at Gorst Creek

Sector: Road • Location: Gorst, Washington, United States

Source: My Northwest

Project
Planned

The project involves replacing the fish culvert at Gorst Creek on State Route 3 south of Gorst. The construction requires a full closure of SR 3 for 16 days to allow for the removal and replacement of the highway section to improve fish passage without impacting fish migration, scheduled during the dry summer period.

Status
Prospective
Sector
Road
Location
Gorst, Washington, United States of America
Updated
22 Jul 2026
Source
My Northwest

ConstructChat

Ask ConstructChat about Fish Passage Project at Gorst Creek

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Fish Passage Project at Gorst Creek” is an infrastructure initiative in the Road sector, located in Gorst, Washington, United States. Taiyo aggregates data on it from My Northwest.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves replacing the fish culvert at Gorst Creek on State Route 3 south of Gorst. The construction requires a full closure of SR 3 for 16 days to allow for the removal and replacement of the highway section to improve fish passage without impacting fish migration, scheduled during the dry summer period.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Washington

City

Gorst

Source

Source

My Northwest

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project