logo
ProjectClosed

Fisher Field Parking Reconstruction

Closed · Ontario · Last reported Nov 2024

Source: Dodge

This ITT is an invitation by the Town to prospective Bidders to submit Bids for the provision of the reconstruction of two parking lots for Fisher Fields; one on Tenth Line and one on Sixth Street (Simcoe County Road 32), as further described in Appendix D of this ITT. The scope of work generally includes the following: pulverizing or removing existing asphalt; placing and grading of additional gr

Status
Closed
Sector
Raw Materials, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Manufacturing (Industrial), Automotive
Location
Collingwood, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Fisher Field Parking Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fisher Field Parking Reconstruction” is an infrastructure initiative in the Raw Materials sector, located in Collingwood, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This ITT is an invitation by the Town to prospective Bidders to submit Bids for the provision of the reconstruction of two parking lots for Fisher Fields; one on Tenth Line and one on Sixth Street (Simcoe County Road 32), as further described in Appendix D of this ITT. The scope of work generally includes the following: pulverizing or removing existing asphalt; placing and grading of additional granular materials; installation of subdrain; asphalt; pavement markings; signage; and restoration.

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Collingwood

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Raw Materials, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Manufacturing (Industrial), Automotive

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project