Fisher House Replacement
Sector: Power Transmission • Location: West Palm Beach, Florida, United States of America
Source: Dodge USA
The contractor shall provide all labor, tools, and materials necessary for the following work: Design-Build project for the site preparation of approximately .5 acres of land for a future Fisher House construction. The design and construction for the site development include, but are not limited to, permits, topographic survey, temporary and permanent utilities design and connections (e.g., power,
- Status
- Prospective
- Sector
- Power Transmission, Hospital, Water Supply and Storage, Hotel, Commercial, Power Generation (CCGT), Raw Materials
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fisher House Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor shall provide all labor, tools, and materials necessary for the following work: Design-Build project for the site preparation of approximately .5 acres of land for a future Fisher House construction. The design and construction for the site development include, but are not limited to, permits, topographic survey, temporary and permanent utilities design and connections (e.g., power, potable water, wastewater, storm water, and IT, among others). Project is located at the West Pa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Hospital, Water Supply and Storage, Hotel, Commercial, Power Generation (CCGT), Raw Materials |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
