logo

Fisher Street Resurfacing

Sector: Cement • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Marshall Street to Cox Street Length: Approximately 1 Mile District: 1 Community: Good Hope

The County of Riverside Transportation Department is proposing to resurface approximately 1 mile of Fisher Street from Marshall Street to Cox Street. Fisher Street is classified as a Local Road in the County of Riverside’s General Plan. Fisher Street is a two lane road and is 22-26 feet wide.

Project Information FAQ

Project Information

4 Q
The project “Fisher Street Resurfacing” is an infrastructure initiative in the Cement sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Marshall Street to Cox Street Length: Approximately 1 Mile District: 1 Community: Good Hope The County of Riverside Transportation Department is proposing to resurface approximately 1 mile of Fisher Street from Marshall Street to Cox Street. Fisher Street is classified as a Local Road in the County of Riverside’s General Plan. Fisher Street is a two lane road and is 22-26 feet wide. The project proposes widening the road by 2-6 feet, resulting in a total road width of 27-28 feet. The proposed project will include removing the existing roadway followed by placing back with Hot Mix Asphalt (HMA). Additional improvements include: · Reconstruction of concrete driveways · Removing and replacing mailboxes · Constructing AC driveways · Drainage improvements, including reconstruction of dike, construction of new dike, and grading dirt swales · Utility adjustments · Striping of roadway, including pavement markers and reflectors · Salvage/removal and installation of new signs No additional right-of-way, permits to enter and construct (PEC), or temporary construction easements (TCE) will be required to construct the proposed improvements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data