FISHING HARBORS REHAB.
Sector: Seaport • Location: Iceland
Source: World Bank Group
The project would rehabilitate Iceland's southwest coast fisheries, which have been seriously hampered by the volcanic eruption in Vestmannaeyjar, through improvement and expansion of three small and overcrowded harbors on the mainland, where part of the evacuated Vestmannaeyjar fleet of 80 vessels has currently taken refuge. The project comprises: (1) detailed engineering (including a model hydra
- Status
- Closed
- Sector
- Seaport, Government
- Location
- Iceland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about FISHING HARBORS REHAB.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would rehabilitate Iceland's southwest coast fisheries, which have been seriously hampered by the volcanic eruption in Vestmannaeyjar, through improvement and expansion of three small and overcrowded harbors on the mainland, where part of the evacuated Vestmannaeyjar fleet of 80 vessels has currently taken refuge. The project comprises: (1) detailed engineering (including a model hydraulic study) and construction of a new breakwater, basin and quays at Thorlakshofn; (2) construction of new quays, dredging of the basin, rockblasting and dredging of the channel and entrance at Grindavik, and; (3) construction of a new quay at Hornafjordur. |
Original sector | Transportation |
Location
Country | Iceland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Seaport, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in Iceland
- Klaipėda LNG Terminal
- ICELAND INFRASTRUCTURE GROUPED LOAN
- External Timber Cladding in Maritime Conditions
- The Sea as Our Neighbour: Sustainable Adaptation to Climate Change in Coastal Communities and Habitats on Europe’s Northern Periphery 3.11
- Small Craft Emergency Response and Survival Training for Arctic Conditions
- Arctic Preparedness Platform for oil Spill and other Environmental Accidents
- Dalfoss Reefer – Container Vessel
- Real-time Fleet Performance Center (FPC) to optimize energy efficiency in Maritime Transport to reduce fuel consumption and harmful emissions
