Fite Road Drainage Improvement Cullen to Harkey
Sector: Water Supply and Storage • Location: Pearland, Texas, United States of America
Source: Dodge
The project area is located between Harkey Rd on the east and Cullen Pkwy on the west. Approximately 10,500 LF drainage improvements for Fite Road also include Drainage improvement along the west side of Manvel Rd to Mary s Creek outfall. The project will require the removal/replacement of driveways, driveway culverts, and the regrading of the roadside ditches to improve the drainage conveyance. T
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Government, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Pearland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fite Road Drainage Improvement Cullen to Harkey
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project area is located between Harkey Rd on the east and Cullen Pkwy on the west. Approximately 10,500 LF drainage improvements for Fite Road also include Drainage improvement along the west side of Manvel Rd to Mary s Creek outfall. The project will require the removal/replacement of driveways, driveway culverts, and the regrading of the roadside ditches to improve the drainage conveyance. The project will also include mill and overlay of existing asphalt pavement within the project lim... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pearland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Government, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
