Flamanville EPR Shutdown and Power Ramp-Up
Under construction · Normandy · Last reported Apr 2025
Source: Energy News
The Flamanville EPR nuclear reactor experienced a temporary shutdown due to protection mechanisms but resumed its power ramp-up schedule shortly after. This incident did not affect the overall production targets set for summer 2025, as confirmed by EDF.
- Status
- Under Construction
- Sector
- Nuclear, Power Generation (CCGT), Government
- Location
- Flamanville, Normandy, France
- Updated
- 22 Jul 2026
- Source
- Energy News
ConstructChat
Ask ConstructChat about Flamanville EPR Shutdown and Power Ramp-Up
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Flamanville EPR nuclear reactor experienced a temporary shutdown due to protection mechanisms but resumed its power ramp-up schedule shortly after. This incident did not affect the overall production targets set for summer 2025, as confirmed by EDF. |
Original sector | Energy |
Location
Country | France |
State | Normandy |
City | Flamanville |
Source
Source | Energy News |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Government |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
