Flamingo Marina Bulkhead Rehabilitation SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Princeton, Florida, United States of America
Source: Dodge
The project work includes the removal of the existing concrete cap of the bulkhead walls, installation of new steel sheet pile bulkhead walls with cast-in-place concrete cap and precast concrete wall panel cap, site grading, and mechanical/plumbing/electrical equipment replacements and additions, and storm water outfall pipe extensions. The work also includes the removal and replacement of the asp
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Cement, Metal, Commercial, Seaport, Power Generation (CCGT), Manufacturing (Industrial), Road, Steel
- Location
- Princeton, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Flamingo Marina Bulkhead Rehabilitation SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project work includes the removal of the existing concrete cap of the bulkhead walls, installation of new steel sheet pile bulkhead walls with cast-in-place concrete cap and precast concrete wall panel cap, site grading, and mechanical/plumbing/electrical equipment replacements and additions, and storm water outfall pipe extensions. The work also includes the removal and replacement of the asphalt/concrete pavement, timber guide and mooring piles, floating docks and aluminum ramps (where ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Princeton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Forest Products and Packaging, Cement, Metal, Commercial, Seaport, Power Generation (CCGT), Manufacturing (Industrial), Road, Steel |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
